The End of System Integration Testing at Sepahan Equipment Manufacturing Company (STS Co.)
System Integration Testing was conducted successfully at Sepahan Equipment Manufacturing Company (STS Co.) and was approved by …
System Integration Testing was conducted successfully at Sepahan Equipment Manufacturing Company (STS Co.) and was approved by …
Wave 1 of the SAP Implementation Project was completed and put to operation on December 31, 2014 in Mapna Boiler Engineering …
The SAP ERP implementation project started in June 2014 and was put to operation in August 2015 at Sepahan Equipment …